Job Schedule

  • DCAN Industry Recommended Job Schedule Very detailed – covers schedule and time needed to do job correct – note details on doors, trim, countertops etc. in relation to final roll coat of paint – use to educate all parties on the correct sequence of events for efficient construction and cost management and improved quality
  • DCAN RC Channel Install Info How to install properly to mitigate Ridging and Cracking
  • GA-231-2019 Assessing Water Damage Asses Water Damage to Drywall. You don’t always have to demo or toss wet board.
  • GA-236-2013 Joint Treatment in Extreme Weather Finishing in Extreme Weather – with dry time chart.
  • DCAN Final Roll Coat and Touch Up Improve Quality and save cost by doing final roll coat of paint last.
  • DCAN Paint Back into Black More info on importance of painting the final roll coat last.
  • DCAN Masking Tape Removal How to properly remove tape. Slow down when paint is peeling off.
  • Sherwin Willaims – Cold Weather Painting Guideline for painting in cold
  • Dunn Edwards – Cold Weather Painting Guideline for painting in cold
  • Hand Texture Application Guidelines – Covers some basic instruction for skip trowel finish.
  • DCAN Wall Paper Removal and Finishing
  • DRY IN Prior to To Stocking
Helping You Build Better

© 2026 DCAN-SW 

Scroll to top
  • Home
  • Documents
    • Specification
    • Job Schedule
    • Evaluation Guidelines
  • Resources
  • Privacy
  • Contact Us